From Roads and Bridges Construction Company Kobylarnia S.A. dated 24.06.2014

22 static test load of pipe piles Ø500-700 and 2 static test load of CFA type piles within the development of A1 Toruń-Stryków.

See the reference letter »

From STRABAG Sp. z o.o. dated 02.06.2014

649 pile integrity tests and 11 dynamic test loads of piles at the rebuilding site of national roads no 2, 7 and 61 at Warsaw.

See the reference letter »

From BUDIMEX S.A. dated 29.05.2014

Static load tests of high-diameter piles and Sonic-Echo pile integrity tests at the construction site of st. Gen. F. Kleeberg at Białystok.

See the reference letter »

From Remost S.C. dated 28.05.2014

Static load tests of foundation piles within the project "Footbridge on Road 7 in Jawornik at km 692+200".

See the reference letter »

From SOLETANCHE POLSKA Sp z o.o. dated may 2014

Set of test loads of Screwsol type piles on the construction site "Highway A1 Stryków - Tuszyn node".

See the reference letter »

From ENERGOPOL-SZCZECIN S.A. dated 04.02.2014

Set of test loads of foundation piles on the construction site "Bridge over Wisła river at Kamień city within the Provincial Road no 747".

See the reference letter »

From KELLER POLSKA Sp. z o.o. dated 29.01.2014.

Test loads of foundation piles and diaphragm wall within a contract "POMERANIAN METROPOLITAN RAILWAY STAGE I - REVITALISATION of Kokoszowska Railway".

zobacz »

From Strabag sp. z o.o. dated 22.05.2013.

Static load tests of high-diameter piles and Jet-Grouting piles and Sonic-Echo pile integrity tests, at the construction site of the S8 Express Road: Walichnowy junction – Wrocław (A1) junction seg.4.

See the reference letter »

From ZRI Henryk Chrobok & Hubert Chrobok Sp. j. dated 23.01.2013.

Static load test using a rigid plate of a Jet Grouting Column Group at the construction of the Bridge over the River Kłodnica within Provincial Road No 921 in Zabrze.

See the reference letter »

From Zakládání Staveb s.a. w Polsce dated 15.01.2013.

Static tests of bored piles with Sonic-Echo method in the construction of "The Bridge on the River Przemsza in Chełmek within Provincial Road 780 Kraków-Chełmek".

See the reference letter »

From Sando Budownictwo Polska Sp. z o.o. dated 1.03.2012.

Load tests and pile continuity tests of foundation piles within A1-Strykow Torun.

See the reference letter »

From TOPGEO BRNO Sp. z o.o. dated 14.01.2011.

Load tests of foundation piles within road S5 Gniezno-Poznań.

See the reference letter »

From MOSTMAR S.A. dated 17.01.2011.

Set of foundation pile tests at the costruction site of S3 road section from the "Międzyrzecze South" node to the "Sulechów" node.

See the reference letter »

From ENERGOPOL-SZCZECIN S.A.

Set of test loads of the prefabricated reinforced concrete foundation piles on the bypass of Olecko city within National Road no. 65.

See the reference letter »

From INTERCOR Sp. z o.o. dated 19.07.2011.

Set of test loads of foundation piles and diaphragm walls within the rebuild of Niepodległości street at Komorowice and at construction of S69 Expressway from node "Komorowice/Rosta" to node "Krakowska".

See the reference letter »

From KELLER POLSKA Sp. z o.o. dated 17.01.2011.

Test loads of diaphragm walls within a construction of the S5 Expressway Gniezno-Poznań.

See the reference letter »

From Mota-Engil Polska S.A dated 09.12.2009.

Set of foundation pile tests at a construction site of a new bridge over the Wisła river at Sandomierz.

See the reference letter »

From PUT Intercor Sp. z o.o. dated 12.10.2009.

Test loads of the foundation piles on the construction site of footbridge at Kazimierz-Podgórze in Kraków.

See the reference letter »

From PRI Fart Sp.z o.o. dated november 2009.

Static test loads using a ballast at Cedzynia.

See the reference letter »
Ukryj More

From Terramost Sp. z o.o. dated 07.07.2009

Set of foundation pile tests at the construction site of Highway Bypass Road of Wrocław city.

See the reference letter »

From Re-Bau Sp.z o.o. dated 17.06.2009

Side test load of a Ø600mm piles at the construction site of A4 Highway.

See the reference letter »

From Solatanche Polska Sp. z o.o. z dnia 01.06.2009

Test loads of diaphragm walls at the construction site of S8 Expressway - Konotopa node at Warszawa.

See the reference letter »

From P.R.I Pol-Aqua S.A. dated 21.05.2009

Set of tests at the construction site of the National Stadium at Warszawa.

See the reference letter »

From Mota-Engil Polska S.A. dated 01.04.2009

Test at a construction site of the bridge over the Skawa river within the Provincial Road no. 956 at Zembrzyce.

See the reference letter »

From Skanska S.A. dated 25.03.2009

Set of tests at the construction site of the bridge over the Pilica river within Provincial Road no. 785 at Maluszyn city.

See the reference letter »

From De Waal Polska Sp. z o.o. dated 12.12.2008

Set of test loads on the Ø360-460mm foundation piles at the construction site of the CHU Nova Park at Gorzów Wielkopolski.

See the reference letter »

From Dr hab. inż. Kazimierz Gwizdała, prof. PG dated 22.07.2008

Cooperation in the implementation of projects like: Construction of "Warsaw Bridges" at Wrocław, Construction of W-Z Road at Bydgoszcz, Construction of A4 Highway (Wielicka node to Szarów node section).

See the reference letter »

News

archive »
24.11.2016
We have been awarded the title of Building Industry Creators of the Year 2016. The ceremony was held on 24 November 2016 in Sobański Palace in Warsaw.
We wish to thank you for the honor and congratulate the other laureates.
22.06.2016

We are proud to announce that according to a resolution of the general meeting of members of PZWFS, our company, after a year of candidate menbership, will become a full member of PZWFS on the 1 July 2016.

29.01.2016
On behalf of the piling Contractor - Conway STF Ltd. We are in the process of an extensive research program of the prefabricated driven piles.
twitter facebook